Home 116
Creation date / 2014
« 2013
2016 »
January
February
March
April
May
June
July
August
September
October
November
December
All
- Wall removed, floor patched
- Some of the new cabinets are installed, waiting for counter top
- The part of my patch that was not covered by the island, this part had to be patched by the pros.
- The new light I installed (you can see the patch where the old light was on the bottom still curing, pink)
- Countertops done, sink installed
- Better shot of the new sink
- The pull-up outlet in the island.
- An overview of the new countertops (the new R/O unit on the counter to left waiting to be installed)
- Installing the faucet and garbage disposal
- Toasting the new kitchen (almost done)
- Delete this one
- Installing the right-rail for Victoria's barn door
- My wonderful plumbing job
- Installing the tile backsplash
- Cutting in the outlets, oven spacer installed