The trash bins and spice rack next to oven
-
Pull out shelves everywhere! Vertical storage in the foreground.
-
The tile backsplash
-
The cabinet door pulls
-
The cabinet and drawer door pulls
-
The tall-item storage (cookie sheets, cutting boards, etc.)
-
My wonderful plumbing job
-
Installing the tile backsplash
-
Cutting in the outlets, oven spacer installed
-
New far wall cabinets seen from above (with microwave/convection oven slot open)
-
Tall pantry cabinets seen from above
-
Kitchen shot from dining room
-
The new spice racks, one on either side of the stove
-
The pantry, with pull-out shelves.
-
Countertops done, sink installed
-
Better shot of the new sink
-
The pull-up outlet in the island.
-
An overview of the new countertops (the new R/O unit on the counter to left waiting to be installed)
-
Installing the faucet and garbage disposal
-
Toasting the new kitchen (almost done)
-
Delete this one
-
Installing the right-rail for Victoria's barn door
-
The part of my patch that was not covered by the island, this part had to be patched by the pros.
-
The new light I installed (you can see the patch where the old light was on the bottom still curing, pink)
-
Before
-
Cabinets removed, in the process of demolishing the island wall
-
Cabinets removed, in the process of demolishing the island wall
-
Cabinets removed, in the process of demolishing the island wall
-
Cabinets removed, in the process of demolishing the island wall
-
Cabinets removed
-
Wall removed, floor patched
-
Lights raised because the new cabinets are a foot taller than the previous ones
-
Wall removed, floor patched
-
Some of the new cabinets are installed, waiting for counter top
-
Before