Home 24
Creation date / 2014 / Week 38
- The part of my patch that was not covered by the island, this part had to be patched by the pros.
- The new light I installed (you can see the patch where the old light was on the bottom still curing, pink)
- Countertops done, sink installed
- Better shot of the new sink
- The pull-up outlet in the island.
- An overview of the new countertops (the new R/O unit on the counter to left waiting to be installed)
- Installing the faucet and garbage disposal
- Toasting the new kitchen (almost done)
- Delete this one
- Installing the right-rail for Victoria's barn door
- My wonderful plumbing job
- Installing the tile backsplash
- Cutting in the outlets, oven spacer installed
- New far wall cabinets seen from above (with microwave/convection oven slot open)
- Tall pantry cabinets seen from above