- The pull-up outlet in the island.
- An overview of the new countertops (the new R/O unit on the counter to left waiting to be installed)
- Installing the faucet and garbage disposal
- Toasting the new kitchen (almost done)
- Delete this one
- Installing the right-rail for Victoria's barn door
- My wonderful plumbing job
- Installing the tile backsplash
- Cutting in the outlets, oven spacer installed
- New far wall cabinets seen from above (with microwave/convection oven slot open)
- Tall pantry cabinets seen from above
- Kitchen shot from dining room
- The new spice racks, one on either side of the stove
- The pantry, with pull-out shelves.
- The tall-item storage (cookie sheets, cutting boards, etc.)