Home / Scott's personal photos / Remodels, installations, constructions, etc. / Kitchen Remodel Mark 2 35
- Better shot of the new sink
- The pull-up outlet in the island.
- An overview of the new countertops (the new R/O unit on the counter to left waiting to be installed)
- Installing the faucet and garbage disposal
- Toasting the new kitchen (almost done)
- Delete this one
- Installing the right-rail for Victoria's barn door
- The part of my patch that was not covered by the island, this part had to be patched by the pros.
- The new light I installed (you can see the patch where the old light was on the bottom still curing, pink)
- Before
- Cabinets removed, in the process of demolishing the island wall
- Cabinets removed, in the process of demolishing the island wall
- Cabinets removed, in the process of demolishing the island wall
- Cabinets removed, in the process of demolishing the island wall
- Cabinets removed