Home / 15 Most visited 9
Creation date / 2014 / September

-
(28102) The trash bins and spice rack next to oven
-
(28003) Wall removed, floor patched
-
(27959) Lights raised because the new cabinets are a foot taller than the previous ones
-
(27686) Installing the tile backsplash
-
(27576) Countertops done, sink installed
-
(27167) The cabinet and drawer door pulls
-
(27006) The tile backsplash
-
(26958) Some of the new cabinets are installed, waiting for counter top
-
(26831) The cabinet door pulls