Home / 15 Most visited 9
Creation date / 2014 / September

-
(25446) Installing the tile backsplash
-
(25411) The trash bins and spice rack next to oven
-
(25262) Countertops done, sink installed
-
(25198) Wall removed, floor patched
-
(25118) Lights raised because the new cabinets are a foot taller than the previous ones
-
(24978) The cabinet and drawer door pulls
-
(24890) Some of the new cabinets are installed, waiting for counter top
-
(24852) The tile backsplash
-
(24828) Cutting in the outlets, oven spacer installed