Home / 15 Most visited 9
Creation date / 2014 / September

-
(25449) Installing the tile backsplash
-
(25415) The trash bins and spice rack next to oven
-
(25267) Countertops done, sink installed
-
(25205) Wall removed, floor patched
-
(25122) Lights raised because the new cabinets are a foot taller than the previous ones
-
(24982) The cabinet and drawer door pulls
-
(24895) Some of the new cabinets are installed, waiting for counter top
-
(24857) The tile backsplash
-
(24830) Cutting in the outlets, oven spacer installed