(25442) Installing the tile backsplash
-
(25405) The trash bins and spice rack next to oven
-
(25259) Countertops done, sink installed
-
(25189) Wall removed, floor patched
-
(25109) Lights raised because the new cabinets are a foot taller than the previous ones
-
(24976) The cabinet and drawer door pulls
-
(24886) Some of the new cabinets are installed, waiting for counter top
-
(24851) The tile backsplash
-
(24828) Cutting in the outlets, oven spacer installed