Home / 15 Most visited 9
Post date / All / September

-
(28133) The trash bins and spice rack next to oven
-
(28047) Wall removed, floor patched
-
(28004) Lights raised because the new cabinets are a foot taller than the previous ones
-
(27707) Installing the tile backsplash
-
(27593) Countertops done, sink installed
-
(27191) The cabinet and drawer door pulls
-
(27027) The tile backsplash
-
(26971) Some of the new cabinets are installed, waiting for counter top
-
(26861) The cabinet door pulls