Home / 15 Most visited 9
Creation date / 2014 / All / Tuesday

-
(25450) Installing the tile backsplash
-
(25415) The trash bins and spice rack next to oven
-
(25268) Countertops done, sink installed
-
(25206) Wall removed, floor patched
-
(25126) Lights raised because the new cabinets are a foot taller than the previous ones
-
(24983) The cabinet and drawer door pulls
-
(24898) Some of the new cabinets are installed, waiting for counter top
-
(24860) The tile backsplash
-
(24831) Cutting in the outlets, oven spacer installed